← Projects

Air+ production dashboard

Rebuilt a factory's real production workflow from its own systems, then showed exactly where the work was getting stuck.

  • Data
  • Manufacturing
  • Process Analysis

The problem

A factory knows what it produced. It is much less certain about where the time went. That information exists, but it is scattered across three systems that were never designed to be read together: the ERP knows what was ordered, the MES knows what happened on the floor, and the PLM knows what the thing is supposed to be.

Nobody has the whole picture, so bottleneck arguments get settled by seniority rather than evidence.

What I built

I reconstructed the plant's actual production workflow by joining its ERP, MES and PLM data into a single model of how work really moved — not the documented process, the real one — and built a dashboard that showed where it stalled.

The analysis identified the top five bottlenecks and quantified 8.5 hours of delay, with a specific remedy proposed for each one.

How it works

The work is mostly in the joins. Each system has its own idea of what a unit of work is, and reconciling those identities is the hard part — once a single object can be followed across all three, the time it spends waiting between stages becomes visible arithmetic.

From there the dashboard shows the process as a flow with its queues exposed, so a bottleneck reads as an accumulation rather than as a number in a table.

Decisions and trade-offs

Reconstructing the real process rather than modelling the documented one. Documented processes describe intent. The delay lives precisely in the gap between intent and practice, so modelling the documentation would have found nothing.

Quantifying delay in hours, not percentages. A percentage invites debate about the denominator. "8.5 hours" is a number an operations manager can act on this week.

A remedy attached to every bottleneck. An analysis that names problems without proposing fixes gets filed. Pairing each finding with a specific action is what turns it into a decision.

What I'd do differently

I would validate the reconstructed workflow with a line operator before building anything on top of it. The data model was sound, but the people who do the work every day would have spotted my wrong assumptions in minutes — and confirmed the right ones far faster than I could derive them.

Built with

ERP data · MES data · PLM data · Data modelling · Dashboarding