[{"data":1,"prerenderedAt":101},["ShallowReactive",2],{"project-\u002Fprojects\u002Fair-plus":3},{"id":4,"title":5,"body":6,"demo":80,"description":72,"extension":81,"featured":82,"meta":83,"navigation":84,"order":85,"path":86,"pitch":87,"repo":80,"seo":88,"showcase":80,"stack":89,"stem":95,"tags":96,"__hash__":100},"projects\u002Fprojects\u002Fair-plus.md","Air+ production dashboard",{"type":7,"value":8,"toc":71},"minimark",[9,14,18,21,25,28,31,35,38,41,45,52,58,64,68],[10,11,13],"h2",{"id":12},"the-problem","The problem",[15,16,17],"p",{},"A factory knows what it produced. It is much less certain about where the time\nwent. That information exists, but it is scattered across three systems that were\nnever designed to be read together: the ERP knows what was ordered, the MES knows\nwhat happened on the floor, and the PLM knows what the thing is supposed to be.",[15,19,20],{},"Nobody has the whole picture, so bottleneck arguments get settled by seniority\nrather than evidence.",[10,22,24],{"id":23},"what-i-built","What I built",[15,26,27],{},"I reconstructed the plant's actual production workflow by joining its ERP, MES\nand PLM data into a single model of how work really moved — not the documented\nprocess, the real one — and built a dashboard that showed where it stalled.",[15,29,30],{},"The analysis identified the top five bottlenecks and quantified 8.5 hours of\ndelay, with a specific remedy proposed for each one.",[10,32,34],{"id":33},"how-it-works","How it works",[15,36,37],{},"The work is mostly in the joins. Each system has its own idea of what a unit of\nwork is, and reconciling those identities is the hard part — once a single\nobject can be followed across all three, the time it spends waiting between\nstages becomes visible arithmetic.",[15,39,40],{},"From there the dashboard shows the process as a flow with its queues exposed, so\na bottleneck reads as an accumulation rather than as a number in a table.",[10,42,44],{"id":43},"decisions-and-trade-offs","Decisions and trade-offs",[15,46,47,51],{},[48,49,50],"strong",{},"Reconstructing the real process rather than modelling the documented one.","\nDocumented processes describe intent. The delay lives precisely in the gap\nbetween intent and practice, so modelling the documentation would have found\nnothing.",[15,53,54,57],{},[48,55,56],{},"Quantifying delay in hours, not percentages."," A percentage invites debate\nabout the denominator. \"8.5 hours\" is a number an operations manager can act on\nthis week.",[15,59,60,63],{},[48,61,62],{},"A remedy attached to every bottleneck."," An analysis that names problems\nwithout proposing fixes gets filed. Pairing each finding with a specific action\nis what turns it into a decision.",[10,65,67],{"id":66},"what-id-do-differently","What I'd do differently",[15,69,70],{},"I would validate the reconstructed workflow with a line operator before building\nanything on top of it. The data model was sound, but the people who do the work\nevery day would have spotted my wrong assumptions in minutes — and confirmed the\nright ones far faster than I could derive them.",{"title":72,"searchDepth":73,"depth":73,"links":74},"",2,[75,76,77,78,79],{"id":12,"depth":73,"text":13},{"id":23,"depth":73,"text":24},{"id":33,"depth":73,"text":34},{"id":43,"depth":73,"text":44},{"id":66,"depth":73,"text":67},null,"md",false,{},true,5,"\u002Fprojects\u002Fair-plus","Rebuilt a factory's real production workflow from its own systems, then showed exactly where the work was getting stuck.",{"title":5,"description":72},[90,91,92,93,94],"ERP data","MES data","PLM data","Data modelling","Dashboarding","projects\u002Fair-plus",[97,98,99],"Data","Manufacturing","Process Analysis","y4usZxvNLMY2Qy_3TkbFC3jSigqPOHXlYOyzVI3Vzew",1793108521252]